Tell the system which products you run and how they differ.
Map the specifications that drive changeover work — materials, tooling, temperatures, weights — for each product you run. ProChangeover uses that matrix to generate the right task list automatically whenever you switch between them. No more relying on whoever wrote the last paper sheet.
| SKU | Material | Temp (°C) | Mould |
|---|---|---|---|
| SKU-A100 | HDPE | 180 | #42 |
| SKU-B200 | ABS | 220 | #78 |
| SKU-C310 | PP | 195 | #42 |
| SKU-D450 | Nylon | 240 | #91 |
Switching SKU-A100 → SKU-B200 generates 6 tasks automatically

