For manufacturing teams running high-mix lines

SMED Changeover Software for Manufacturers

Stop losing production time to unplanned changeovers.

ProChangeover replaces ad-hoc execution with SMED-based digital workflows — so every operator knows exactly what to do next, every sign-off is captured, and you can see where time was lost after every run.

  • Guided task lists per product pair
  • Live sync across your whole shift team
  • Gantt timeline and sign-off record every run

Self-serve. 7-day free trial. No credit card. · Need rollout help?

Operational Step 1

Tell the system which products you run and how they differ.

Map the specifications that drive changeover work — materials, tooling, temperatures, weights — for each product you run. ProChangeover uses that matrix to generate the right task list automatically whenever you switch between them. No more relying on whoever wrote the last paper sheet.

Product specifications
SKU
Material
Temp (°C)
Mould
SKU-A100HDPE180#42
SKU-B200ABS220#78
SKU-C310PP195#42
SKU-D450Nylon240#91

Switching SKU-A100 → SKU-B200 generates 6 tasks automatically

Operational Step 2

Every operator sees exactly what to do next — in order, on any device.

When a changeover starts, your team gets one shared live checklist. Each task shows the spec to hit, in the sequence it needs to happen. Completed steps are visible to everyone. No parallel paper sheets, no version confusion, no supervisor needing to walk the line to find out where things stand.

Changeover Tasks
0 / 5
Product 1 Product 2

1. Clean conveyor belt surface

2. Set temperature to 180 °C

3. Replace mould #42 with #78

4. Adjust pressure to 3.5 bar

5. Verify alignment markers

Operational Step 3

After the run, see the Gantt. Find the delay. Fix the standard.

Every completed changeover produces a timestamped Gantt timeline. You can see which tasks ran to standard, which ran long, and where the overlap was missing. When a step shows up red — like a pressure adjustment that took twice as long as planned — you have the data to update the standard and close the gap on the next run.

Timeline
100%
Cleaning
Settings
Tooling
Inspection
08:00
08:05
08:10
08:15
08:20
Belt
Nozzles
Temp
⚠ +4 min over target
Pressure
Speed
Mould swap
QC Check
Completed
Issue found
20 min total

One line. One week. See if it changes anything.

Most teams are up and running within a day. Start with your highest-frequency changeover on one line. Once you have one run logged and a timeline to look at, you'll know whether this works for your operation — before you roll it out further.

1 Start with one line Pick your highest-frequency changeover
2 Up in under a day Configure, invite your team, run it
3 See the Gantt after run 1 Decide if it works before rolling out

Pricing

One plan. Full platform.

No feature tiers. No hidden add-ons.

Operations Plan

Digital SMED changeovers.

7-day free trial
$49 /month

Per department.

  • Unlimited production lines and changeovers
  • Tablet + desktop web app — no install needed
  • Real-time sync across your whole shift team
  • Timestamped sign-off and searchable run history
  • Gantt-style timeline for every completed run
Start now in 10 minutes

Cancel anytime. Contact us if needed.

After your first run you'll have:

Run your first standardized changeover this week.

Set up in 10 minutes. Invite your shift team. After the first run you'll have a Gantt timeline and a baseline time you didn't have before.

  • Timestamped sign-off record

    Audit-ready from run one

  • Gantt timeline of every task

    See exactly where time was lost

  • A repeatable standard

    Not dependent on whoever showed up today

7-day free trial · Self-serve setup · No IT project required

Before you go

Rolling this out to a team? We'll help you do it properly.

Most teams are self-serve. But if you're evaluating ProChangeover for multiple lines or need to get buy-in internally, we're a real conversation away.

Talk to us

Rolling out to a team?

We'll walk you through a configuration session — products, tasks, and your first line set up before you hang up.

Building a business case?

We can talk through how to frame changeover time savings for your plant manager or ops director.

Questions about fit?

High-mix discrete, food and beverage, plastics. Happy to talk through yours.

Featured on Findly.tools Featured on SaaSBison